Dubai Metro in numbers

6 a.m - the metro starts working on all days of the week except Friday

6-8 minutes - interval of movement of trains of the "green" metro line

10-15 meters - the height of most of the route of both metro lines

14 trains serve the green line during peak hours, at off-peak times - 10 trains

18 - total number of green metro line stations

20 seconds - waiting period for trains at stations of the "red" metro line

29 - total number of stations of the "red" metro line

47 - total number of pedestrian crossings on the "red" and "green" metro lines

50 - the total number of trains moving on both lines during peak hours, 28 - at off-peak times

52.9 km - the length of the "red" metro line

60-63 minutes occupies the passage between the two terminal stations of the metro "red" line

110 km / h - the average speed of the metro trains, excluding stopping times

500 meters - the maximum distance between the metro station and the bus serving it

660 employees police of various ranks ensure the safety of metro passengers

3,000 surveillance cameras installed at stations, in transitions and subway tunnels

2 000 000 - average monthly number of passengers served by the subway

USD 7.8 billion - metro construction cost

Watch the video: Dubai Metro Red Line ADCB to Al Jafliya (April 2024).